RFT - Implementation of upgrading work at various PNG Power Limited electricity transmission and distribution network.

Application for Prequalification
 
PNG Power Limited
Electricity Transmission and Distribution Works
 
On behalf of the Australian Government, the Economic and Social Infrastructure Program (ESIP) is calling for applications from suitably qualified firms to undertake implementation of upgrading work at various PNG Power Limited electricity transmission and distribution network throughout PNG.
The upgrade works includes turnkey Engineer Procure Construct (EPC) for new high voltage transmission towers and conductor lines, distribution transformers, high voltage switchgear, distribution feeders, substation equipment and control and monitoring equipment.

This tender is open to companies that meet the criteria detailed in the prequalification documentation. Companies may apply for all, or part of the proposed works as outlined in the application for prequalification.
Interested parties may request a copy of prequalification documentation, quoting PNG Power Limited Electricity Transmission and Distribution Works Prequalification, by email, to esiptenders@esip.org.pg
 
Questions about the prequalification can be emailed to esiptenders@esip.org.pg by 4.00 pm (Port Moresby time) on 21 September 2022.
 
The deadline for prequalification submission is 4.00 pm (Port Moresby time) on Friday 23 September 2022. ESIP will not accept submissions that are late.
 
Cardno International Development, a DT Global Company, is an equal opportunity employer and is committed to child protection in all fields.
 
ESIP is supported by the Australian Government and managed by
Cardno International Development, a DT Global Company
 
Cardno
International
Development
A DT Global Company